Atlas 2.0 — Launch Readiness Review

Go / No-Go review · 25 May 2026 · Owner: Platform team · Target GA: 30 May

Where we stand

Beta scorecard

Beta orgs onboarded

142

+28 this week

Crash-free sessions

99.4%

+0.6pt vs wave 1

p95 API latency

213ms

-41ms after hardening

Open P0 / P1

0 / 3

-9 in 2 weeks

Launch-blocker burndown

Launch-blocker burndownLine chart titled "Launch-blocker burndown". X-axis: (unlabeled) (6 categories). Y-axis: open blockers from 0 to 40. 2 series: Plan, Actual.010203040Apr 14Apr 21Apr 28May 5May 12May 19open blockers

Road to GA

Milestones

  1. Code freeze

  2. Beta wave 1 — 40 orgs

  3. Beta wave 2 — 100 orgs

  4. Performance hardening

  5. Go / No-Go sign-off

  6. General availability

Readiness by workstream

Launch checklist

Done

  • Load test @ 5× peak

    Held p95 < 250 ms at 5× projected GA traffic.
  • Rollback runbook

  • Pricing & plans page live

  • On-call rotation staffed

In flight

  • EU data-residency docs

    In legal review — ETA 29 May.
  • Launch blog + changelog

At risk

  • Localized onboarding (DE / FR)

    Slipping to a fast-follow in 2.0.1.

Open risks

RiskSeverityOwnerMitigation
EU data-residency docs incompleteMediumLegalShip as day-2; note in release notes
Localized onboarding not readyLowGrowthFast-follow in 2.0.1
Support volume spike at GAMediumSupport+2 temp agents; macros pre-written

This is the most stable launch candidate we've shipped — the burndown held the line for six straight weeks. — Dana Reyes, VP Engineering